Escher Silverman Global – Driving Edo State Forward through Accelerated Road Development
Project Overview: Escher Silverman Global takes pride in its role as the Sole Engineering Consultant for the Edo State Accelerated Road Development Program Phase 1. This extensive initiative in Nigeria, funded by the State Government, reflects our commitment to detailed design, innovative engineering, and comprehensive construction supervision of key highways, totaling over 200 km.
Project Details:
- Project Title: Edo State Accelerated Road Development Program Phase 1.
- Location: Nigeria.
- Contract Value: $2.1 million.
- Funding Agency: State Government.
- Client: Kaduna Polytechnic Tudun Wada.
- Project Timeline: June 2017 – 2020.
- Escher Silverman Global’s Role: Sole Engineering Consultant.
In-Depth Project Description: Escher Silverman Global plays a pivotal role in the detailed design, preparation of bidding documents, bill of engineering measurements, and evaluation, as well as construction supervision of 10 key highways in Edo State. This transformative project includes value-added engineering, reinforcing the commitment to advancing infrastructure development.
Services Provided: Our comprehensive suite of services reflects our commitment to driving excellence in road development and infrastructure enhancement:
- Design and Value Engineering: Crafting innovative and efficient designs while optimizing value to meet the highest standards.
- Design Review: Thoroughly examining and enhancing the proposed designs for maximum efficiency and sustainability.
- ESIA and ESMP Reports: Preparing Environmental and Social Impact Assessment and Management Plans to ensure responsible development.
- Supervision of Highways: Overseeing the construction and maintenance of key highways, ensuring quality and adherence to specifications.
- Value-Added Engineering: Incorporating innovative engineering solutions to enhance the overall value and impact of the projects.
Key Projects within the Program: Escher Silverman Global’s role includes the design and supervision of various critical road projects, such as Ugbor-Amagba Road, Ikiran-Oke-Ikakumoh Road, Saint Saviour Road Rehabilitation, Dualization of Ekehuan Road, and more.
Project Impact: Escher Silverman Global’s role as the Sole Engineering Consultant in the Edo State Accelerated Road Development Program Phase 1 is set to transform the transportation landscape, foster economic growth, and improve the overall quality of life for the residents of Edo State.
For further inquiries or to explore more about our expertise in infrastructure projects, please feel free to contact us. Escher Silverman Global – Engineering Tomorrow’s Roads Today, paving the way for a brighter future in Edo State.